Decision-making trial and evaluation laboratory (Dematel)-based system dynamics modeling of construction delays in Cagayan State University building projects [ manuscript] / Ronmark N. Angel, Les Paul Zyldjan P. Lemi, Stephen James C. Teja. (Record no. 21164)
| 000 -LEADER | |
|---|---|
| fixed length control field | 02017nam a22001577a 4500 |
| 082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
| Classification number | Civil 0150 |
| Item number | 2025 c.1 |
| 100 ## - MAIN ENTRY--AUTHOR NAME | |
| Personal name | Angel, Ronmark N., author. |
| 245 ## - TITLE STATEMENT | |
| Title | Decision-making trial and evaluation laboratory (Dematel)-based system dynamics modeling of construction delays in Cagayan State University building projects [ manuscript] / Ronmark N. Angel, Les Paul Zyldjan P. Lemi, Stephen James C. Teja. |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
| Year of publication | ©2025. |
| 300 ## - PHYSICAL DESCRIPTION | |
| Number of Pages | xviii, 100 pages ; |
| Other physical details | 30 cm. |
| 500 ## - GENERAL NOTE | |
| General note | Thesis (B.S.) -- Cagayan State University, 2025. |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc | Construction delay is a recurring problem in infrastructures, particularly in institutions of learning such as Cagayan State University. This research strives to create a model to identify, assess, and predict the influence of delaying factors in university building constructions through an integrated DEMATEL-based System Dynamics method. They initially determined the highest delay factors from a validated questionnaire completed by construction professionals. The factors were subsequently assessed based on the DEMATEL method to establish their cause-and-effect relationships and influence weights. The DEMATEL results were used as inputs for creating a System Dynamics (SD) model, which simulated the interactions of delay factors over time. An Excel-based forecasting model was developed with the help of the SD model, and the same model was tested with historical progress data of three finished CSU projects. The model demonstrated a good correspondence between simulated and actual progress curves, and forecasting deviations were well within the 10% acceptable margin. The results indicate the ability of the combined DEMATEL-SD model to facilitate proactive planning and delay mitigation for university construction projects. Keywords: Construction delays, Decision-Making Trial and Evaluation Laboratory (DEMATEL), System dynamics modeling, Forecasting |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Lemi, Les Paul Zyldjan P. |
| 700 ## - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Teja, Stephen James C. |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Koha item type | Academic Research |
| Source of acquisition | Permanent Location | Date acquired | Koha item type | Collection code | Accession Number | Lost status | Shelving location | Withdrawn status | Current Location | Full call number |
|---|---|---|---|---|---|---|---|---|---|---|
| School | Cagayan State University - Carig Library | 2025-07-10 | Academic Research | Academic Research | CIVIL0150 | Academic Research Section | Cagayan State University - Carig Library | Civil 0150 2025 c.1 |