Normal view MARC view ISBD view

Construction delay risk assessment in flood control projects in 3rd district of Cagayan : A fuzzy modeling approach [manuscript] / Jan Maurene D. Angoluan, Kathleen Mae R. Piñon, Eunica B. Sicam.

by Angoluan, Jan Maurene D., author.
Physical details: xiii, 117 pages ; 29 cm. Year: 2025
Tags from this library: No tags from this library for this title. Add tag(s)
Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Location Collection Call number Status Date due Barcode
Books Books Academic Research Section Academic Research Civil 0124 2025 c.1 (Browse shelf) Available CIVIL0124
Browsing Cagayan State University - Carig Library Shelves , Shelving location: Academic Research Section , Collection code: Academic Research Close shelf browser
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
No cover image available
Civil 0121 2025 c.1 Assessment of safety and risk management in drainage and canal excavation in third district of Cagayan [manuscript] / Shiela Mae A. Eugenio, Mary Ashley M. Tabao, John Dexter O. Urbi. Civil 0122 2025 c.1 Effects of temperature on labor productivity : a mathematical model for construction workers in Tuguegarao City [manuscript] / Jan Renelle S. Bunuen, Leighy H. Galamay, Jean Narcisa C. Taberna. Civil 0123 2025 c.1 Proposed gymnasium at Cagayan State University Lal-lo Campus [manuscript] / John Fritz C. Baloran, John Dwight Michael G. Dadali, Jim Perry P. David. Civil 0124 2025 c.1 Construction delay risk assessment in flood control projects in 3rd district of Cagayan : A fuzzy modeling approach [manuscript] / Jan Maurene D. Angoluan, Kathleen Mae R. Piñon, Eunica B. Sicam. Civil 0125 2025 c.1 Towards walkable Cagayan State University Carig Campus : evaluation and design of campus pedestrian facilities [manuscript] / Alyssa Marie G. Arellano, Harold B. Calimag, Rexie A. Julian, Eliza Rose C. Narag. Civil 0126 2025 c.1 Mitigating landslide risk : a slope stability analysis and protection design for purok Danna, Barangay Manga, Peñablanca, Cagayan [manuscript] / Babylyn Batang, Louise Giselle C. Buguina, Jei-Anne C. Sinco. Civil 0127 2025 c.1 Effects of temperature on labor productivity : a mathematical model for construction workers in Tuguegarao City [manuscript] / Anthony P. Alarilla, Almira S. Subac, Paulo D. Binayug.

Thesis (B.S.) -- Cagayan State University, 2025.

The fuzzy logic risk assessment model was utilized in this study to identify and rank the key delay factors affecting government-sponsored flood control projects in the 3rd District of Cagayan. Thirty-six risk factors were categorized into seven categories: Client/Owner, Contractor, Consultant, Material, Equipment, Labor, and External-related. Calculation of the Risk Index for Delay (FID) was carried out using a fuzzy inference system that took into account both Probability and Severity Indexes, allowing for the ranking of risk magnitude under heavy uncertainty of expert judgment. The major delay factors identified include weather effects, change orders from the client, insufficient workforce, inadequate manpower and equipment, force majeure events, delays in delivery of materials, low labor productivity, and malfunctioning of equipment. External-related factors are contributing most to delays. The fuzzy modeling approach is shown to be effective in comparison to conventional methods for prioritization of risks and for better decision-making. Recommendations to minimize delays are better project planning, allocation of resources, permitting that involves less time, and inter-agency collaboration. Future works can focus on construction projects of other types and locations, have more expert respondents, and consider applying other fuzzy membership functions or decision-making tools such as AHP, TOPSIS, or PROMETHEE. From the findings of this study, a solid ground is provided in the management of construction delays for timely delivery of infrastructure that safeguards vulnerable communities.

Keywords: fuzzy logic, risk assessment, construction delay, flood control projects

There are no comments for this item.

Log in to your account to post a comment.

Cagayan State University University Library, Carig Campus
Tuguegarao City, Cagayan 3500 | www.csucarig.edu.ph

Powered by Koha